Create a Website Account - Manage notification subscriptions, save form progress and more.
Damage to the City Infrastructure during construction requires immediate repair by those responsible for the damages. If the party responsible for the damages does not have the labor or materials to repair the infrastructure immediately, the City of Celina Public Works Department will repair the damages and the cost of said repair is to be borne by the responsible party. The responsible party will only be able to continue work in the City of Celina after the invoice is paid to the City of Celina for the repair of the damages. Any work performed 14 days after a line locate was completed will require a new locate request. The line locate is an approximate location and it is the General Contractor’s responsibility to determine the actual elevations and horizontal locations by non-destructive methods. When working within 20 feet of a wet utility line 16 inches or larger, the contractor is required to pothole and contact a Public Works Line Locator for verification before construction begins.
By checking I agree, you agree and acknowledge your electronic signature is valid and binding in the same force and effect as a handwritten signature.
This field is not part of the form submission.
* indicates a required field